Aller au contenu

Views

Calendar view

A calendar view places records on dates by month, week, day, or resource. Learn how to set the date fields, colors, and scheduling lanes.

Cette page n'a pas encore été traduite. Vous lisez la version originale.

A calendar view places each record on a date. Use it for anything you plan in time: appointments, deliveries, shifts, site visits, deadlines. With a resource field, the calendar becomes a scheduling board with one lane per room, person, or vehicle.

What a calendar needs#

  • A Start Date Field: a Date column, or the record's created or last-modified date. This is required.
  • A Title Field: what each event is called. This can be a Text, ID, Single Select, Status, or Number column. This is required.
  • An End Date Field if the work takes longer than a moment. With an end date, each event spans a range.

Pick a date column whose precision fits the work: a date-only column for a whole day on the month grid, a date and time for an appointment in the week view.

Create a calendar view#

  1. In the sidebar, hover over a folder and click +, then choose New view.
  2. Enter a Name and pick Calendar View as the View Type.
  3. In Calendar Configuration, choose the Start Date Field and the Title Field.
  4. Optionally choose an End Date Field, a Subtitle Field, a Color Field, and a Default View Mode.
  5. Under Parent Data View, pick the access filter the calendar reads from.
  6. Click Create.

To change these settings later, open Settings and choose General.

Calendar settings#

SettingWhat it does
Start Date FieldWhere each event starts. Required.
End Date FieldWhere each event ends. Choose No end date (single-day events) to leave it out.
Title FieldThe event's name. Required.
Subtitle FieldAn optional second line on each event.
Color FieldColors events by a Single Select or Status column, so each option has its own color.
Default View ModeWhich mode the calendar opens in: Month, Week, Day, or Resource (Scheduling).
Swimlane / Resource FieldSplits the calendar into one lane per value. See Resource scheduling.
Swimlane Height (px)How tall each lane is.
Start Time, End TimeThe hours shown in the week and day views.
Slot DurationThe size of each time slot in the week and day views: 15, 30, or 60 minutes.
Show weekendsShows or hides Saturday and Sunday.
Show empty swimlanesShows lanes that have no events in the visible range.
Show event timeShows the time on each event.

Resource scheduling#

Choose a Swimlane / Resource Field and switch to Resource to see one lane per value: a bay, a technician, a vehicle. This lets you plan "this bay, this technician" without a separate table. The field can be a Status, Single Select, Multi Select, Text, Person, Relation, or ID column.

Work in the calendar#

  • Switch modes. Use Month, Week, Day, and Resource in the calendar's toolbar.
  • Reschedule. Drag an event to another day. If the event has an end date, the end moves by the same number of days.
  • Reassign. In resource mode, drag an event to another lane to change its resource field.
  • Open a record. Click an event to open its record page.

Rescheduling is a normal update, so business rules still apply. If a rule refuses the change, you see the reason and the record isn't changed.

If you see Calendar Not Configured, open Settings, choose General, and set a start date field and a title field.

Bloqué, ou il manque quelque chose ? Demandez à la communauté.

Demander à la communauté

Afficher en MarkdownSuggérer une amélioration